Unit was painted, 12 567BC was replaced with a 12-567C, 2 wheels installed

2 wheels cut, 2 New front windows installed, 26L Brake Rebuilt, Fan Bearings

Replaced, Installed Alignment Control Couplers and a 92 day inspection

 

 

 

 

 

 

 

                  

 

SW1200  Ex Mo Pac

 

                   

 

SW1200 After it went through our Shop.