Unit was Painted, New Alignment Control Draft Gear and Couplers Installed.

6-26L Brake Conversion done along with New Control Stand and Compressor.

 

SD9 Rebuild

 

 

While at the shop they had all electrical gone thru, Prime Mover was inspected and all bolts retorqued, Air Was Rebuilt, New brushes installed, along with a Fresh 92 day and Painted.

 

 

 

 

 

 

 

 

 

SD18 Rebuild

 

 

Unit was Qualified, Painted, New 40 Fat Forty Wheels Installed, 

Eco Tank Installed, 26L Brake Renewed. And New Floor Installed.

 

 

 

 

SD20 Rebuild

 

 

 

Unit was Partially Rewired,  3 Traction Motors Changed, and Qualified for Service