This Locomotive is going to the shop to have a complete low voltage rewire, BOA Traction Control System

18 KW Aux Gen Installed,  26L rebuilt, along with a 92 day inspection.

 

 

 

 

 

 

 

 

 

 

 

 

 

UNIT WAS PAINTED, 92 DAY INSPECTION, NEW MAIN GEN, NEW TRACTION MOTOR, 24 TO 26l CONVERSION

PRIME MOVER WAS REPACKED.